Creating a Non-Blocking 4x4 Switch on the AQ2200 Multi Application Test System

One possible way to create a non-blocking 4x4 switch on the AQ2200 Multi Application Test System is by using multiple 2x2 switch modules. Please refer to the attached file.

Related Products & Solutions

Optical Component Test System

  • Modular platform for automated optical testing
  • Attenuators, switches, power meters, light sources, and SMUs

Optical Test Equipment

Market-leading optical test solutions with best-in-class OSAs to validate high-speed fiber networks and next-generation photonics systems.

Precision Making

Top